You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
I'm creating the templates for the CG and WG meetings.
The WG meetings have historically been once a month, which causes them to periodically switch weeks when compared to the biweekly meetings (which is most of the other wasm meetings). We could switch to once every 4 weeks instead.
We could also make them less frequent (e.g. bimonthly or every 8 weeks), since they fairly regularly get cancelled due to lack of agenda.
I don't have a strong opinion on either of these, but my weak preference would be to switch to 4-weekly (and still cancel as needed). Thoughts?
The text was updated successfully, but these errors were encountered:
I'm creating the templates for the CG and WG meetings.
The WG meetings have historically been once a month, which causes them to periodically switch weeks when compared to the biweekly meetings (which is most of the other wasm meetings). We could switch to once every 4 weeks instead.
We could also make them less frequent (e.g. bimonthly or every 8 weeks), since they fairly regularly get cancelled due to lack of agenda.
I don't have a strong opinion on either of these, but my weak preference would be to switch to 4-weekly (and still cancel as needed). Thoughts?
The text was updated successfully, but these errors were encountered: