-
Notifications
You must be signed in to change notification settings - Fork 0
2023 Projects
Matt Simerson edited this page Apr 17, 2023
·
31 revisions
- repair damaged power line #20
- Water line between Dam & Cistern subject to freezing #25
- build a drying shed to hold 2 seasons of wood
- finish removing moldy/musty carpet tiles in First Aid Room
- tunnel: replace blocking along lodge to air seal (plywood + foam insulation)
- Seal cedar deck railings
- Drain line under onion shower needs pipe supports (check with Ben or Matt)
- multi-speed fan for kitchen range hood
- outlets and lighting in tunnel
- Thing PEX tubing buckles under snow load, change to EMT tubing of similar diameter #31
- Shipping containers for storage #8
- Ski Hill trench for comms & power #15
- Mach Tow Routing Jigs labelling currently stored loose in Tow Hut Attic, attach proper (metal or laminated) labels to jigs so future Meany-ites know what they are looking at
- Ski Hill, needs new required safety signs
- Design and install new propane powered generator for lodge
- coordinate Forest Stewardship Plan #41 production
- establish defensible space #39
- get Zoo extension final inspection #14
- host a chainsaw safety course at Meany #43
- spray foam the underside of the deck / roof of the tunnel #29
- rebuild "temporary" east wall of first aid & ping pong room
- replace electric heaters in dorms with heat pumps
- FUNDED: widen and slope the driveway #13
- insulate wood shed wall, cannot use styrofoam or batting because of hornets/insects
- caulk unused screw holes in roof of Pump House.
- Brush 420 Rd, clean ditches, fill potholes
- Install new culverts on Nikki's to improve drainage