Fused moe gemm + silu activation #438
Triggered via pull request
January 23, 2025 09:12
Status
Failure
Total duration
5h 11m 2s
Artifacts
–
amd_perf_kernel_Integration_tests.yml
on: pull_request
Runner-Preparation-AMD
0s
Check-File-Changes
20s
pre-commit (code formatting)
53s
Matrix: Integration-Tests-AMD
Annotations
3 errors and 4 warnings
Integration-Tests-AMD (self-hosted, gfx942, upstream)
Process completed with exit code 1.
|
Integration-Tests-AMD (self-hosted, gfx942, local)
The job running on runner ppac-pla-r18-35 has exceeded the maximum execution time of 90 minutes.
|
Integration-Tests-AMD (self-hosted, gfx942, local)
The operation was canceled.
|
Runner-Preparation-AMD
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
Runner-Preparation-AMD
The `set-output` command is deprecated and will be disabled soon. Please upgrade to using Environment Files. For more information see: https://github.blog/changelog/2022-10-11-github-actions-deprecating-save-state-and-set-output-commands/
|
Check-File-Changes
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|
pre-commit (code formatting)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
|