-
Notifications
You must be signed in to change notification settings - Fork 4.3k
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
🐙 source-google-calendar: run up-to-date pipeline [2025-01-25] #47915
Open
airbyteio
wants to merge
1
commit into
master
Choose a base branch
from
up-to-date/source-google-calendar
base: master
Could not load branches
Branch not found: {{ refName }}
Loading
Could not load tags
Nothing to show
Loading
Are you sure you want to change the base?
Some commits from the old base branch may be removed from the timeline,
and old review comments may become outdated.
+3
−2
Conversation
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
The latest updates on your projects. Learn more about Vercel for Git ↗︎
|
|
octavia-squidington-iii
added
area/connectors
Connector related issues
connectors/source/google-calendar
labels
Oct 29, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
October 29, 2024 16:08
8d68181
to
d3b5315
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Oct 29, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
November 5, 2024 00:02
d3b5315
to
a963c27
Compare
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Nov 5, 2024
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2024-10-29]
🐙 source-google-calendar: run up-to-date pipeline [2024-11-05]
Nov 5, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
November 5, 2024 00:04
a963c27
to
a508e36
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Nov 5, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
December 12, 2024 11:26
a508e36
to
74a4ecf
Compare
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Dec 12, 2024
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2024-11-05]
🐙 source-google-calendar: run up-to-date pipeline [2024-12-12]
Dec 12, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
December 12, 2024 11:29
74a4ecf
to
7b56ac1
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Dec 12, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
December 14, 2024 12:36
7b56ac1
to
c3fda27
Compare
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Dec 14, 2024
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2024-12-12]
🐙 source-google-calendar: run up-to-date pipeline [2024-12-14]
Dec 14, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
December 14, 2024 12:37
c3fda27
to
35a462f
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Dec 14, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
December 21, 2024 12:53
35a462f
to
71d7215
Compare
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Dec 21, 2024
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2024-12-21]
🐙 source-google-calendar: run up-to-date pipeline [2024-12-28]
Dec 28, 2024
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Dec 28, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
December 28, 2024 15:13
5112fcf
to
4222982
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Dec 28, 2024
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 4, 2025 14:11
4222982
to
6733c10
Compare
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Jan 4, 2025
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2024-12-28]
🐙 source-google-calendar: run up-to-date pipeline [2025-01-04]
Jan 4, 2025
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 4, 2025 14:12
6733c10
to
e0d382e
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Jan 4, 2025
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 11, 2025 12:55
e0d382e
to
89d27a2
Compare
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2025-01-04]
🐙 source-google-calendar: run up-to-date pipeline [2025-01-11]
Jan 11, 2025
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Jan 11, 2025
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 11, 2025 12:57
89d27a2
to
56fcd0e
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Jan 11, 2025
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 18, 2025 13:17
56fcd0e
to
a73e025
Compare
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Jan 18, 2025
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2025-01-11]
🐙 source-google-calendar: run up-to-date pipeline [2025-01-18]
Jan 18, 2025
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 18, 2025 13:17
a73e025
to
824c0d7
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Jan 18, 2025
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 25, 2025 17:51
824c0d7
to
79a7ec2
Compare
octavia-squidington-iii
removed
the
area/documentation
Improvements or additions to documentation
label
Jan 25, 2025
airbyteio
changed the title
🐙 source-google-calendar: run up-to-date pipeline [2025-01-18]
🐙 source-google-calendar: run up-to-date pipeline [2025-01-25]
Jan 25, 2025
PATCH bump source-google-calendar version to 0.0.2 Build source-google-calendar docker image for platform(s) linux/amd64, linux/arm64 Get dependency updates Create or update pull request on Airbyte repository Add changelog entry
airbyteio
force-pushed
the
up-to-date/source-google-calendar
branch
from
January 25, 2025 17:54
79a7ec2
to
d1456f8
Compare
octavia-squidington-iii
added
the
area/documentation
Improvements or additions to documentation
label
Jan 25, 2025
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Labels
area/connectors
Connector related issues
area/documentation
Improvements or additions to documentation
auto-merge
connectors/source/google-calendar
up-to-date
Add this suggestion to a batch that can be applied as a single commit.
This suggestion is invalid because no changes were made to the code.
Suggestions cannot be applied while the pull request is closed.
Suggestions cannot be applied while viewing a subset of changes.
Only one suggestion per line can be applied in a batch.
Add this suggestion to a batch that can be applied as a single commit.
Applying suggestions on deleted lines is not supported.
You must change the existing code in this line in order to create a valid suggestion.
Outdated suggestions cannot be applied.
This suggestion has been applied or marked resolved.
Suggestions cannot be applied from pending reviews.
Suggestions cannot be applied on multi-line comments.
Suggestions cannot be applied while the pull request is queued to merge.
Suggestion cannot be applied right now. Please check back later.
Update source-google-calendar
This PR was autogenerated by running
airbyte-ci connectors --name=source-google-calendar up_to_date --pull
We've set the
auto-merge
label on it, so it will be automatically merged if the CI pipelines pass.If you don't want to merge it automatically, please remove the
auto-merge
label.Please reach out to the Airbyte Connector Tooling team if you have any questions or concerns.
Operations
Upgrade the base image to the latest version in metadata.yaml: Successful
PATCH bump source-google-calendar version to 0.0.2: Successful
Build source-google-calendar docker image for platform(s) linux/amd64, linux/arm64: Successful
Get dependency updates: Successful
Create or update pull request on Airbyte repository: Successful
Add changelog entry: Successful
Dependency updates
We use
syft
to generate a SBOM for the latest connector version and the one from the PR.It allows us to spot the dependencies that have been updated at all levels and for all types of dependencies (system, python, java etc.).
Here are the dependencies that have been updated compared to
airbyte/source-google-calendar:latest
.Keep in mind that
:latest
does not always match the connector code on the main branch.It is the latest released connector image when the head commit of this branch was created.