Add DocC article explaining the most common renewal errors #95
Triggered via pull request
January 16, 2024 00:56
Status
Cancelled
Total duration
2m 57s
Artifacts
–
main.yml
on: pull_request
Lint code with SwiftLint
12s
Matrix: pod-lint
Matrix: test-package
Matrix: test
Annotations
7 errors
Test on iOS using Xcode 15.0.1
The operation was canceled.
|
Test on macOS using Xcode 15.0.1
The operation was canceled.
|
Test on tvOS using Xcode 15.0.1
The operation was canceled.
|
Test Swift package using Xcode 15.0.1
Canceling since a higher priority waiting request for 'CI-refs/pull/824/merge' exists
|
Test Swift package using Xcode 15.0.1
The operation was canceled.
|
Lint podspec using Xcode 15.0.1
Canceling since a higher priority waiting request for 'CI-refs/pull/824/merge' exists
|
Lint podspec using Xcode 15.0.1
The operation was canceled.
|