Skip to content

integration-tests #1734

integration-tests

integration-tests #1734

Triggered via schedule January 14, 2025 06:03
Status Cancelled
Total duration 2h 53m 14s
Artifacts

integration_test.yaml

on: schedule
Integration test with juju 3.1  /  Plan
Integration test with juju 3.1 / Plan
Integration test using private-endpoint  /  Plan
Integration test using private-endpoint / Plan
openstack interface test using private-endpoint  /  Plan
openstack interface test using private-endpoint / Plan
Matrix: Integration test with juju 3.1 / build
Waiting for pending jobs
Matrix: Integration test using private-endpoint / build
Waiting for pending jobs
Matrix: openstack interface test using private-endpoint / build
Waiting for pending jobs
Matrix: Integration test with juju 3.1 / Integration tests / Integration tests
Waiting for pending jobs
Integration test with juju 3.1  /  Plan Image Scanning
Integration test with juju 3.1 / Plan Image Scanning
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
Integration test using private-endpoint  /  Plan Image Scanning
Integration test using private-endpoint / Plan Image Scanning
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
openstack interface test using private-endpoint  /  Plan Image Scanning
openstack interface test using private-endpoint / Plan Image Scanning
Integration test with juju 3.1  /  Required Integration Test Status Checks
Integration test with juju 3.1 / Required Integration Test Status Checks
Matrix: Integration test with juju 3.1 / scan
Waiting for pending jobs
Integration test using private-endpoint  /  Required Integration Test Status Checks
Integration test using private-endpoint / Required Integration Test Status Checks
Matrix: Integration test using private-endpoint / scan
Waiting for pending jobs
openstack interface test using private-endpoint  /  Required Integration Test Status Checks
openstack interface test using private-endpoint / Required Integration Test Status Checks
Matrix: openstack interface test using private-endpoint / scan
Waiting for pending jobs
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

1 error
integration-tests
The run was canceled by @javierdelapuente.