Skip to content

chore(deps): Bump code.cloudfoundry.org/go-log-cache/v2 from 2.0.6 to 2.0.7 in /src/autoscaler #7715

chore(deps): Bump code.cloudfoundry.org/go-log-cache/v2 from 2.0.6 to 2.0.7 in /src/autoscaler

chore(deps): Bump code.cloudfoundry.org/go-log-cache/v2 from 2.0.6 to 2.0.7 in /src/autoscaler #7715

Status Cancelled
Total duration 6m 19s
Artifacts

postgres.yaml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Build suite=test, postgres=12
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/2580/merge' exists
Build suite=test, postgres=12
The operation was canceled.
Build suite=integration, postgres=12
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/2580/merge' exists
Build suite=integration, postgres=12
The operation was canceled.
Build suite=integration, postgres=15
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/2580/merge' exists
Build suite=integration, postgres=15
The operation was canceled.
Build suite=test, postgres=15
Canceling since a higher priority waiting request for 'Build with Postgres/refs/pull/2580/merge' exists
Build suite=test, postgres=15
The operation was canceled.