Add docs for execProtocol (#196) #110
build_and_test.yml
on: push
Stylecheck
39s
Build PGlite WASM dependencies
/
Build WASM Postgres
15s
Make a PR or publish
43s
Publish website with demos
0s
Annotations
2 errors
Build and Test packages dependent on PGlite
Canceling since a higher priority waiting request for 'Build and test PGlite packages-refs/heads/main' exists
|
Build and Test packages dependent on PGlite
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
pglite-dist
Expired
|
4.56 MB |
|
pglite-interim-build-files
Expired
|
4.07 MB |
|
pglite-package
Expired
|
4.47 MB |
|
pglite-web-build-files
Expired
|
4.22 MB |
|
postgres-wasm
Expired
|
9.68 MB |
|