Skip to content

#205: test works

#205: test works #565

Triggered via push December 22, 2023 09:19
Status Failure
Total duration 1m 1s
Artifacts

itest.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

23 errors
build (ubuntu-latest, 18, 16)
Process completed with exit code 1.
build (ubuntu-latest, 18, 12)
The job was canceled because "ubuntu-latest_18_16" failed.
build (ubuntu-latest, 18, 12)
Process completed with exit code 1.
build (ubuntu-latest, 11, 16)
The job was canceled because "ubuntu-latest_18_16" failed.
build (ubuntu-latest, 11, 16)
Process completed with exit code 1.
build (windows-latest, 18, 12)
The job was canceled because "ubuntu-latest_18_16" failed.
build (windows-latest, 18, 12)
The operation was canceled.
build (windows-latest, 18, 16)
The job was canceled because "ubuntu-latest_18_16" failed.
build (windows-latest, 18, 16)
The operation was canceled.
build (windows-latest, 11, 12)
The job was canceled because "ubuntu-latest_18_16" failed.
build (windows-latest, 11, 12)
The operation was canceled.
build (ubuntu-latest, 11, 12)
The job was canceled because "ubuntu-latest_18_16" failed.
build (ubuntu-latest, 11, 12)
The operation was canceled.
build (macos-latest, 18, 12)
The job was canceled because "ubuntu-latest_18_16" failed.
build (macos-latest, 18, 12)
The operation was canceled.
build (macos-latest, 11, 12)
The job was canceled because "ubuntu-latest_18_16" failed.
build (macos-latest, 11, 12)
The operation was canceled.
build (windows-latest, 11, 16)
The job was canceled because "ubuntu-latest_18_16" failed.
build (windows-latest, 11, 16)
The operation was canceled.
build (macos-latest, 11, 16)
The job was canceled because "ubuntu-latest_18_16" failed.
build (macos-latest, 11, 16)
The operation was canceled.
build (macos-latest, 18, 16)
The job was canceled because "ubuntu-latest_18_16" failed.
build (macos-latest, 18, 16)
The operation was canceled.