Upgrade deps, add storybook #10852
Triggered via pull request
January 10, 2025 10:05
Status
Cancelled
Total duration
1m 15s
Artifacts
–
elixir.yml
on: pull_request
Static checks (format, credo, dialyzer)
1m 6s
Matrix: build
Annotations
6 errors
Build and test (ce_test, postgres:16)
Canceling since a higher priority waiting request for 'Elixir CI-refs/pull/4947/merge' exists
|
Build and test (ce_test, postgres:16)
The operation was canceled.
|
Build and test (test, postgres:15)
Canceling since a higher priority waiting request for 'Elixir CI-refs/pull/4947/merge' exists
|
Build and test (test, postgres:15)
The operation was canceled.
|
Static checks (format, credo, dialyzer)
Canceling since a higher priority waiting request for 'Elixir CI-refs/pull/4947/merge' exists
|
Static checks (format, credo, dialyzer)
The operation was canceled.
|