Skip to content

GO: Fixing docs and interfaces (#2897) #15

GO: Fixing docs and interfaces (#2897)

GO: Fixing docs and interfaces (#2897) #15

Triggered via push January 9, 2025 07:44
Status Failure
Total duration
Artifacts

This workflow graph cannot be shown

A graph will be generated the next time this workflow is run.

Annotations

1 error
Invalid workflow file: .github/workflows/create-ephemeral-self-hosted-runner.yml#L1
`workflow_job` is not a valid event name