Notifications
You must be signed in to change notification settings - Fork 4
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
Browse files
Browse the repository at this point in the history
* update document structure (#14), add new section (#9) * Create Implementation_Plan.adoc Text draft for the introduction * Update wis2_implementation_plan.adoc * Delete transition-guide/sections/Implementation_Plan.adoc --------- Co-authored-by: Haddouch Hassan <[email protected]>
- Loading branch information
1 parent
4d1597f
commit f879287
Showing
7 changed files
with
94 additions
and
49 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file was deleted.
Oops, something went wrong.
This file was deleted.
Oops, something went wrong.
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,40 @@ | ||
== Management of WIS centres | ||
|
||
=== National Centres | ||
|
||
During the transition (2025-2030): | ||
|
||
* National Centres (NCs) will decide when to stop the GTS and WIS1, preferably before 2030, but not later than 2033. | ||
* NCs shall deploy a WIS2 node, on-premises or in the cloud, to publish their data and discovery metadata, they may use one of the three options: | ||
** use Free and Open Source Software System (FOSS), for example wis2box | ||
** use a commercial solution | ||
** develop their own solution in accordance with the Technical Regulations of WIS 2.0 | ||
* NCs shall check that all data and metadata transmitted in WIS1 and GTS are published in WIS2 in accordance with the WCMP2 | ||
* NCs shall support their users to access data from WIS1 and WIS2 | ||
* NCs shall notify WMO when they decide to stop GTS and WIS1 | ||
* NCs shall run GTS/WIS1 and WIS2 in parallel for a period to ensure a smooth transition. | ||
|
||
=== Data Collection and Production Centres | ||
|
||
During the transition (2025-2030): | ||
|
||
* Data Collection and Production Centres (DCPCs) will decide when to stop WIS1 system, preferably before 2030, but not later than 2033. | ||
* DCPCs shall deploy a WIS2 node, on-premises or in the cloud, to publish their data and discovery metadata, they may use one of the three options: | ||
** use Free and Open Source Software System (FOSS), for example wis2box | ||
** use a commercial solution | ||
** develop their own solution in accordance with the Technical Regulations of WIS 2.0 | ||
* DCPCs shall check that all data published in WIS1 are published in WIS2 | ||
* DCPCs shall check that all discovery metadata published in WIS1 are published in WIS2 in accordance with the WCMP2 | ||
* DCPCs shall support their customers to access data from WIS1 and WIS2 when the migration is completed | ||
* DCPCs shall notify WMO when they decide to turn off WIS1 | ||
* DCPCs shall run WIS1 and WIS2 in parallel for a period to ensure a smooth transition and that all their customers are served by WIS2. | ||
|
||
=== Global Information System Centres | ||
|
||
During the transition (2025-2030): | ||
|
||
* Global Information System Centres (GISCs) will decide when to stop WIS1 system, preferably before 2030, but not later than 2033. | ||
* To be able to decommission their WIS1 systems, GISCs shall liaise with their users and with centers in their AoR and point them to the WIS Portals of the WIS Authorities, namely GISC Seoul and GISC Offenbach. | ||
* GISC Seoul and GISC Offenbach will continue to provide WIS1 services and maintain their WIS1 Catalogues until the transition from GTS and WIS1 to WIS2 is advanced. | ||
* GISCs shall support the centres in their AoR within the implementation of WIS 2.0 and ensuring the effective operation of WIS. | ||
* GISCs shall notify WMO when they decide to turn off WIS1 |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,6 @@ | ||
== Introduction | ||
|
||
The Executive Council, with Resolution 34 (EC-76), endorsed the WMO Information System 2.0 (WIS2) implementation plan and recognized the importance of establishing a pilot phase to develop the WIS2 infrastructure and begin testing it to be ready for a pre-operational phase in 2024, and then for the transition starting on 2025. This plan will be implemented according to the schedule provided in Figure 1. The pilot phase has been completed at the end of 2023, with several countries collaborating in building the WIS2 infrastructure. Each country had a different role in the WIS2 framework and implemented a specific component. Starting in January 2024, the implementation of WIS2 will enter the pre-operational phase, and the WIS2 services shall be ready to transition to an operational configuration, which is critical to ensure that WIS2 can serve the WMO community operationally from the beginning of 2025. It is planned to migrate to WIS2 between 2025 and 2030, with an expected progress rate of up to 90%. The GTS is planned to be decommissioned by 2033. | ||
|
||
.WIS2 implementation timeline | ||
image::images/wis2-timeline.png[WIS2 implementation timeline] |